Completed Stormwater Projects:
Brook Valley Lane: Replaced two failed culvert and catch basins under the road. Completed on 02/05/2021.
Bernadette Lane: Rehabilitation of the pipeline and replaced the catch basin. Completed on 04/07/21.
Brook Forest: Rehabilitation of the drainage pipe and replaced the catch basin. Completed on 03/02/21.
Mayfair Dr.: Failing Bedding and backfill, replaced the pipeline and the catch basing. Completed 05/11/21.
Wild Creek Trail: Rehabilitation of the drainage pipe and replaced the catch basin. Completed on 01/29/2021.