Club Place Phase II Storm Sewer Rehabilitation

Storm Pipe replacement COMPLETED

Updated 8/18/23

Construction Progress - Construction COMPLETED

Background

Several years ago, a resident's Service Request alerted the Stormwater Team of a sinkhole in the road between 1063 and 1069 Club Place.  Upon inspection, the team discovered the entire pipe run from upstream headwall to the downstream headwall required replacement.  Several failure mechanisms were at work.  Corrosion along the entire flow line allowed surrounding backfill materials to wash into the storm sewer causing a series of long, linear sinkholes to form.  A three phased rehabilitation approach was taken.  In the Spring of 2020, Phase I the culvert crossing under Club Place was replaced.  Phase II replaced the system from the downstream side of the right-of-way to the headwall in the subdivision's stormwater detention pond.  Phase III, to be completed in later 2023, will replace the system from the upstream right-of-way between these addresses to the upstream headwall. 

The rehabilitation work consisted of the following:

  • replacement of the 42” CMP pipe with 42" ADS HP Storm polypropylene drainage pipe,
  • replacement of the downstream headwall with new headwall (with energy dissipation measures).

Points of Contact

Tom Roberts, PE, Deputy Director Public Works, Tom.Roberts@BrookhavenGA.gov, 404.637.0528

Steve Osborn, PE, Municipal Projects Manager, Steve.Osborn@BrookhavenGA.gov, 404.637.0520

 

Click any thumbnail image to view a slideshow

Club Place Existing Stormwater system
Club Place Proposed stormwater pipe replacement work
Club Place Existing CMP corrosion
Club Place Existing CMP storm pipe site pics
Club Place Existing CMP storm pipe site pics
New storm Pipe in progress
Storm pipe replacement construction
Headwall construction
completion of storm pipe backfill
New outfall headwall and riprap
Club Place Completed- site pic