4202 Long Branch Court Storm Sewer Culvert Repair
Update 8/18/23
Construction Progress - Completed, May 16, 2023
Background
This system is on a list of failing metal drainage pipes under roadways scheduled for resurfacing in the 2024 Street Paving Lists. Field assessments of the stormwater infrastructure at this location determined the culvert and curb inlets were not candidates for trenchless rehabilitation and required open-cut replacement. The 30" CMP under Long Branch Court was heavily corroded and holes were present along the invert.
The rehabilitation work scope will be as follows:
- Replacement of the 30” CMP culvert under the roadway with 30" reinforced concrete pipe (RCP),
- Replacement of two (2) curb inlet structures on both sides of the roadway,
- Installation of a concrete patch and asphalt resurfacing over the storm sewer excavation work
Points of Contact:
Tom Roberts, PE, Deputy Director Public Works, Tom.Roberts@BrookhavenGA.gov, 404.637.0528
Steve Osborn, PE, Municipal Projects Manager, Steve.Osborn@BrookhavenGA.gov, 404.637.0520