Ashford Dunwoody Road/Peachtree Road Intersection Improvement-COMPLETED

Ashford Dunwoody Rd at Peachtree Rd completed

ASHFORD-DUNWOODY R0AD/PEACHTREE ROAD PROJECT - COMPLETED!

This intersection Improvement Project is one of the mid-term projects (MT-01) recommend in the Ashford Dunwoody Road Corridor Study adopted by Council on April 25, 2017.  In addition, this is one of the intersection improvement projects recommended in the Brookhaven Comprehensive Transportation Plan (Project # I-1) adopted by Council on September 9, 2014. 

Purpose of this project is to improve the right turn movements on Ashford Dunwoody Road and Peachtree Road at this intersection.

Some of the improvements at the intersection are:

  • Extended right turn lane on southbound Ashford Dunwoody Road to Oglethorpe Drive
  • Dedicated right-turn lane on southbound Peachtree Road, increase the turn radius in the northeast corner of intersection, install a concrete island, and provide space for shelter/waiting area at the bus stop on Peachtree Road.
  • Reduce the skew of the intersection with Peachtree Road
  • Signal improvements as necessary for the new configuration.
  • Install ten-foot multi-use path on the east side of ADR with five-foot planted buffer
  • Install five-foot sidewalk on the west side of ADR with a two-foot wide grass strip
  • Pedestrian, streetscapes and landscape improvements
  • Drainage improvement

Funding Source: This project is funded by 2018/2019 SPLOST allocation, including Design, rights-of-way acquisition and Construction 

Status Update January 24, 2024

The project is COMPLETE

Engineering Design Firm: Thomas & Hutton
Council awarded construction contract on 12/08/2020
Contractor:  Ohmshiv Construction 

Click any thumbnail image to view a slideshow

Ashford Dunwoody Rd completed
Peachtree Rd final asphalt surfacing construction
Peachtree Rd final asphalt surfacing construction
Ashford Dunwoody Rd asphalt leveling binder construction
Peachtree Golf Course-New Driveway extension to Ashford Dunwoody Road
Intersection open to traffic (looking at ADR from Peachtree Rd)
Intersection open to traffic (looking at ADR from Peachtree Rd)
ADR Lanes open to traffic
Traffic Signal Realignment
Peachtree Rd-ADR traffic signal realignment
Peachtree Rd Right Turn Lane construction
MUP sidewalk sub base work
Peachtree Road Sidewalk
MUP Turn Up sidewalk/ wall reinforcing
MUP Turn Up sidewalk/ wall location
MUP Turn Up sidewalk/ wall location
MUP Turn Up sidewalk/ wall location
Turn Up wall coating