Projects Completed in 2022
-
Merriman Ln Drainage Improvements: LaVista Park. Upgrade drainage system with curb inlets, flumes, a lined ditch, curbs, and improved driveway aprons. Complete 2/23/22.
-
Windsor Pkwy: EMERGENCY REPAIR. Replace the failing 18” CMP, CBs & HW under Windsor Pkwy. Start: 2/7/22. Complete: 2/17/22.
-
2017 NF Nancy Creek Stream Restoration Project – 2017 319(h) Cost Share Grant – Downstream of Murphey Candler Spillway to Confluence with Nancy Creek. Ed Castro Landscaping: Complete 1/2/22. Currently in monitoring phase.
-
Green Meadows Ln In-Stream Headwall / Road Erosion Protection: Replace failing outlet structure adjacent to W side of Green Meadows Ln with a headwall and retaining wall. Complete: 4/5/22
-
Ashwoody Ct Drainage Conveyance Trunk– Replace failing 24”CMP, junction box and upstream Headwall. Start 5/11/22. Complete: 5/31/22
-
3378 Woodrow Way Drainage Outfall– Replace failing 24”CMP, remove buried junction box and replace downstream headwall. Start: 6/01/22. Complete: 6/22/2022.
-
Canmont Drive Storm Drainage Flume Emergency Repair: Replace flume and top to prevent storm debris from entering creek. the roadway to the creek, replace catch basins, junction box, construct a new headwall and riprap outfall to the creek. Start: 8/8/22. Complete: 8/12/22
-
3910 Harts Mill Lane Drainage System and Outfall Rehab: Replace a failing 24" CMP pipe to the creek, replace catch basin, construct new junction boxes to accomodate the steep slope of the storm drainage area, construct a new headwall with energy dissipation and riprap outfall to the creek. Start: 6/21/22. Complete: 8/23/22
-
Sylvan Circle Drainage System & Outfall Rehab: Replace a failing 18" and 24" CMP pipe under the roadway to the creek, replace catch basins, junction box, construct a new headwall and riprap outfall to the creek. Start: 8/22/22. Complete: 9/13/22
-
Burch Circle Drainage System & Outfall Rehab: Replace a failing 24" CMP pipe under the roadway to the creek, replace catch basins, junction box, construct a new headwall and riprap outfall to the creek. Start: 12/05/22. Complete: 12/16/22
-
N. Cliff Valley Way Emergency Storm Pipe Repair: Replace a failing 18" CMP pipe under adjacent to sidewalk from the curb to large junction box in green space, replace sidewalk. Start: 10/18/22. Complete: 10/25/22
-
Granger Dr at Granger Ct Storm Sewer Trunk Line and Outfall: Replace failing 24" CMP crossing Granger Dr and Granger Ct to the outfall. Begin: August 2022. Completed: 12/21/22
-
MARTA, Peachtree Rd, and Brookhaven Green Storm Sewer Cleaning, CCTV, and Condition Assessment
-
CITYWIDE: Closed circuit television / video drainage pipe inspection and cleaning program.